Δ Power supply:
Yuhang is located in the center of the power grid of Zhejiang Province, with a stable and reliable power supply. The fluctuation of 10KV switching-in voltage electrical power is less than + 7%, while that of 35KV switching-in voltage less than + 5 %.
Δ Water supply:
The water used for production and domestic life is supplied by urban water net, with water quality up to the State standards for potable water.
Δ Drainage and sewerage:
Rainwater and sewage are discharged separately. Rain- water drainage (DN 1500) is switched directly into river net and discharged directly into the Grand Canal. While sewage shall be internally purified first by inlet pipes and discharged into sewerage net (DN500) installed in the district, after meeting the State draining standards, it will be discharged into the drainage river net by a sewage pump station.
Δ Communications:
Communications and transmission in the district have been digitized, with visible telephone, ISDN, DDN and grouping exchange system opened.
Δ Water capacity expansion: free of charge
Δ Capacity of power supply:
35KV substation; capacity: 24000KVA
110KV substation; capacity: 63000KVA
Δ Industrial water supply expenditure: 1.70 RMB yuan/kw.h;
Δ Water supply capacity: 120 thousand tons/day
Δ Industrial electrical power supply expenditure:
Peak power load: 0.611 RMB yuan/kw.h; valley power load: 0.382RMB yuan/kw.h for1-10KV or higher (Price for large industries) supply. peak power load: 0.593 RMB yuan/kw.h; valley power load: 0.371 RMB yuan/kw.h for 35KV or higher supply
~ Steam: 104 RMB yuan/ton
~ Building cost: 600-700 RMB yuan/m2 for frame structural workshops
Note: The above data are subject to changes with decrees.
|